Success partner for your global takeoff,
The Global Network of Korea Eximbank.

How to enlarge/reduce the letter size

Enlarge the screen : Please press and hold ctrl key and press + key additionally to enlarge it. Shrink the screen : Please press and hold ctrl key and press - key additionally to reduce it.

E-Mail this

Did you find useful information at KEXIM?
Recommend the information you see now to anyone you want to share with.
After entering the following details, you can share contents by clicking "SEND"

@
@
Your Partner For Global Business Your Partner For Global Business
한국수출입은행

Consent to Personal Information Collection an Use

Purpose of Collection and Use
The Customer`s personal information shall be collected and used to help the Bank identify the user of the Environment and Social Impact Assessment Report.
Items to be Collected and Used
[Required Information] Full name, Affiliation, E-mail address
Use and Retention Period
The Personal information shall be retained and used by the Bank for 1 month from the date of consent to the collection and use of personal information.
Right to Refuse to Consent and Consequences thereof
The Customer has the right to refuse to provide consent to the collection and use of personal information. However, if the Customer elects not to provide such consent, the Bank is entitled to refuse to provide the Environmental and Social Assessment Reports to the Customer.

I hereby consent to the Bank`s collection and use of my personal information stated above.

Application form

*Required

@

Export Credit and Environmental Review

Environmental Information

To guarantee transparency throughout the environmental procedures, Korea Eximbank discloses environmental information to interested parties wishing to receive a copy of the environmental information, who will be required to submit their names and addresses.

The Export-Import Bank of Korea Engineering & Environment Advisory Department
The Export-Import Bank of Korea Engineering & Environment Advisory Department
Address 38 Eunhaeng-ro Yeungdeungpo-gu, Seoul 07242, Korea
E-mail hjchoi@koreaexim.go.kr Fax +82-2-3779-6209
Total 27 (Current 3/3)
Approved projects after January 2019 search
No. Category Project Location Description Posting Date ESIA
7 A Vung Ang II Thermal Power Plant Project Ky Anh Town, Ha Tinh Province, Vietnam Construction and operation of Ultra Super Critical(USC) Coal Fired Power Plants(660MW×2) 2020.03.06
6 A JAWA 9&10 Coal Fired Steam Power Plant Suralaya Industrial Complex, Banten Province, Indonesia Construction and Operation of Ultra Super Critical(USC)2 Coal Fired Power Plants(1,000MW x 2) 2020.02.18
5 B The Silvertown Tunnel South-east London, United Kingdom Construction and operation of new dual carriageway road link, through a twin bored tunnel beneath the River Thames, from the Blackwall 2019.12.19
4 A Nigeria NLNG Train 7 Bonny Island, Niger Delta, Nigeria Construction and operation of a LNG Terminal(Train 7) and related facilities at an existing LNG Plant(Train 1~6) 2019.12.05
3 A Project Marigold Pengerang Integrated Complex("PIC"), Malaysia The development, construction and operation of Integrated refining and petrochemicals complex at Pengerang Integrated Complex 2018.10.12
2 A Quebrada Blanca Phase 2 Copper Mining Project Tarapaca Region, Northern Chile Construction and operation of copper mining facilities including a concentrator plant, a tailing facility, transmission lines, roads, a desalination plant, and a port 2019.03.22
1 A Upper Trishuli-1 HEP (216 MW) Rasuwa District, Nepal The development, construction and operation of 216MW Run-of-river Hydroelectric Power Plant 2019.03.07
1 2 3